Carrs Road North Water Retention Basin

Carrs Road North Water Retention Basin

As part of the new infrastructure required for Christchurch's rebuild and new sub division developments in the north, a new water retention basin at Carrs Road was granted resource consent.

Having already undertaken and successfully completed the Carrs Road South Water Retention Basin project, GSL were once again successful in their bid with this project.

GSL were given a six week timeframe in which to have the project completed. 

This project saw GSL undertake:

  • Overall project management responsibilities for this project
  • Sourcing and overseeing contractors undertaking the tree removal
  • Erosion and sediment control to protect the water ways
  • Liaising with CCC and other contractors also working on and near the site on other projects
  • Reshaping and grading of the basin to form the design levels
  • Placement of top soil and spreading ready for hydro seeding and soft landscaping
  • Hydro-seeding
  • Excavation and construction of embankments to form the flush basin
  • Landscaping works
  • Formation and planting of landscaping areas including mulching and establishment.

Despite it being one of Christchurch's wettest winters on record, GSL were able to successfully complete this project with little interruption and to a high standard. 

Project Photos

Case Studies

Lifey spring BEFORE1

Liffey Springs

Liffey Springs is a new subdivision in Lincoln. Grounds & Services Ltd (GSL) were contracted to implement the Landscape Design wit...
Read more...

Carrs Rd progress7

Carrs Road

As part of the new infrastructure required for Christchurch's rebuild and new sub division developments in the north, a new water ...
Read more...

AC during1

Accessible city

GSL were subcontracted by Fulton Hogan to help create the footpaths and cycle ways as part of the Accessible City initiative. Acce...
Read more...

RZ during 0000 Layer 9

Residential Red Zone Land Treatment

Following the demolition and removal of residential homes in Bexley, GSL was awarded the job of levelling and grassing the Crown o...
Read more...

during 0000 Layer 7

Broken Run subdivision

Planting, playgrounds and paths… no problem to GSL With the development of the Broken Run subdivision in Wigram, GSL were once aga...
Read more...

DJI00854

Eastman Wetlands Stage 1

With significant levels of residential development taking place near Halswell, creating a best-practice stormwater treatment and f...
Read more...

20151223 132450 resized

Kaputone Creek Realignment

Christchurch City Council engaged Grounds & Services Ltd to realign and naturalise an existing  creek to support stormwater manag...
Read more...